SuperCO2 Cluster Mesh for Data Center Power
Natural-gas prime power for AI data centers, built from dozens of 500 kW supercritical CO2 turbine modules instead of one large gas turbine. It delivers 800 VDC straight to the racks, with no transformers and no AC-to-DC conversion.
Number up, don't scale up
AI campuses need tens of megawatts now, and aeroderivative gas turbines are booked for years. The Cluster Mesh takes a different route: a proven 500 kW sCO2 module, factory-built in large numbers and grouped around natural-gas furnace pods. Every module is identical, so the plant grows in small steps and keeps running when one unit is serviced.
- Supercritical CO2 turbines are the only prime mover; combustion gas never touches the working fluid
- Higher efficiency than the LM2500 class once both are measured at the 800 VDC bus
- N+4 redundancy: losing one module costs about 1.7% of output, not the whole plant
- Flat efficiency at part load: modules switch on and off, each one stays at its best point
- Water-free, oil-free rotating equipment on foil and magnetic bearings

Measured at the rack, not at the generator
A data center pays for the fuel it takes to put DC power on the rack bus. A gas turbine makes medium-voltage AC, which has to pass through a transformer and a solid-state transformer or rectifier to reach 800 VDC, losing about 4%. The Cluster Mesh rectifies inside each module, in one 98.5%-efficient step.
Gas turbine figures are published or customer-supplied terminal efficiencies (JT25 37.5%, LM2500XPRESS+G4 39.4%) multiplied by 0.985 × 0.975 for conversion to 800 VDC. Cluster Mesh figures are Infinity Turbine model results at ISO conditions, to be confirmed by testing.
Recompression, reheat and 650 °C
The HX-500 module builds on the SuperCO2 500 HT power train and adds the features that lift a supercritical CO2 cycle toward 48%: a second compressor that recirculates part of the flow, two compact recuperators, and reheat to 650 °C between the turbine stages.
Natural-gas furnace pod
Low-NOx burners with combustion-air preheat and SCR, sized for 16 modules (7.5 MW). Stack temperature about 120 °C; furnace efficiency about 94%.
sCO2 turbines, 650 °C
Radial-inflow power turbines and free-spool turbo-compressors at 275 bar. Cycle efficiency about 47.8%. Dry gas seals keep the generator out of the CO2.
PM generator + SiC rectifier
A 600 Hz permanent-magnet generator feeds a silicon-carbide active rectifier that delivers about 518 kW straight onto the 800 VDC bus.

Built for the 800 VDC AI factory
Rack power is moving to 800 VDC as AI racks approach 1 MW each. The Cluster Mesh speaks that language from the start: no step-up transformer, no medium-voltage switchgear, no solid-state transformer between the generator and the rack.

Pod DC bus
- About 8 MW per pod at 800 VDC (±400 V), 1,500 VDC option for large halls
- Solid-state DC breakers clear faults in microseconds
- Battery storage on the bus absorbs AI load steps and covers module starts
- Pods run together or feed separate data halls

Four pods, sixty-four modules

| SuperCO2 Cluster Mesh 30 | Value |
|---|---|
| Net output | 30 MW at 800 VDC |
| Fuel to DC efficiency (ISO) | ≈40.9% |
| Heat rate | ≈8,800 kJ/kWh (8,340 Btu/kWh) |
| Natural gas | ≈7,370 Nm³/h (≈6.2 MMscfd) |
| Modules | 64 (60 running + 4 spare) |
| Furnace pods | 4 × 7.5 MW |
| CO2 per MWh at the rack | ≈0.49 t (GT ≈0.53–0.56 t) |
| NOx | ≤2.5 ppm with SCR |
| Water consumption | None (optional adiabatic assist) |
| Plot area | ≈0.4 ha (≈1 acre) |
Staged like a server farm
The plant follows load by switching modules and pods, so efficiency stays near 40% down to about a third of output. A single large turbine typically loses 6 to 8 points at half load.
Designed for real weather
Supercritical CO2 cycles are at their best in cool air. In temperate climates the plant runs near its rating all year. On hot sites, adiabatic pre-cooling on the dry coolers holds about 39% efficiency at 35 °C, and plants are sized at their hot-day rating.

A three-step roadmap
Phase 1 · 600 °C
Recompression module using existing SuperCO2 500 HT hardware plus a second compressor spool. About 36.9% to DC. Prototype in 12–18 months.
Phase 2 · HX-500
650 °C with reheat, about 40.9% to DC. 5 MW pilot pod in 24–30 months; first 30 MW plant in about 36 months.
Phase 3 · 1 MW modules
Same architecture, larger wheels and higher component efficiency. About 42.3% to DC.
Cost
Estimated about $2,970/kW installed for a 30 MW plant in series production, in line with current gas turbine plant prices.
Hardware



Looking for pilot sites and partners
Infinity Turbine is seeking data center developers, gas suppliers and manufacturing partners for the Phase 1 prototype and the first 5 MW pilot pod. Licensing of the module and plant designs is available.
Performance, emissions and cost figures are preliminary engineering estimates at ISO conditions (15 °C, sea level) and will be confirmed by detailed design and testing. LM2500 and LM2500XPRESS are products of GE Vernova; JT25 is a product of Jereh Group. Comparisons are for illustration only.