
PDF Publication Title:
Text from PDF Page: 235
20.2.4 GovernmentExpenditureonGeothermalResearchandDevelopment For this purpose, government expenditures cover not only research and development (R&D) in the strict sense, but also contributions to pilot and demonstration projects. The Swiss Federal Office of Energy, the Swiss State Secretariat for Research and Education, the Board of the Swiss Federal Institutes of Technology, the Swiss Innovation Promotion Agency, and the majority of individual Swiss cantons have contributed funds to a number of R&D and pilot and demonstration projects. Although not a member state, Switzerland has a range of bilateral agreements with the European Union (EU) that includes research activities and allows cooperation with and integration into EU- wide R&D activities. Figures for 2010 are not yet available with the exception of funds that have been provided by the Swiss Federal Office of Energy; for Research and Development some CHF 1.0 Million (US$ 1.2 Million), for pilot and demonstration projects some CHF 1.2 Million (US$ 1.4 million), and for support of the Swiss Geothermal Association to promote the uptake of geothermal energy some CHF 0.5 Million (US$ 0.6 million). 20.2.5 IndustryExpenditureongeothermalresearchanddevelopment It is not possible to obtain reliable figures. In many instances, utility industry R&D funds are co- mingled on a corporate basis and include all energy related R&D. Actual expenditures (including those for exploratory work) for 2010 are likely to range from CHF 20-25 million (US$ 24-30 million); the funds derive mostly from (1) Switzerland‘s principal project developers, (2) major Swiss utility companies and their joint research vehicle (swisselectric research), (3) member funds used for Switzerland‘s Laboratory for Geothermics based at the University of Neuchâtel, (4) funds that small and medium sized enterprises contribute, and (5) funds from semi-private regional and local utility companies. 20.3 Status of Geothermal Energy Use in 2010 20.3.1 Electricity Generation There is no power production from geothermal resources in 2010. A number of hydrothermal projects are in the planning phase, which, if suitable resources are encountered, may eventually lead to power production from hydrothermal or enhanced geothermal systems. Significant stimulus is provided by the success of hydrothermal systems in related play concepts of Southern Germany, the possibility to obtain attractive feed-in tariffs, a federal risk guarantee scheme and the obligation of several local utility companies to explore and, if possible, develop geothermal resources. 20.3.2 DirectUse The Swiss Geothermal Association (www.geothermie.ch) publishes annual statistics on the use of geothermal energy in Switzerland. As of September 2011, the numbers for 2010 have not been published, but have been communicated by the service provider (pers. comm., Imhasli et al., 2011). In 2010, some 2.6 TWh of heat have been produced from geothermal systems (Table 20.1), of which 2.0 TWh are directly attributable to geothermal energy (Figure 20.2). The compound annual growth rate since the year 2000 has been a highly satisfactory 13%, attesting to the maturity of the technology, the uptake in the market place and the popularity among consumers. Noteworthy is the continued very high uptake of borehole heat exchanger coupled systems. Together with groundwater heat pumps they have a total share of some 86% of heat production and continue to enjoy high growth rates both in terms of installed capacity and heat produced. Thermal spas continue to contribute around 240 GWh of produced heat in Switzerland (Figure 20.2). 232PDF Image | Geothermal Research and Tech IEA
PDF Search Title:
Geothermal Research and Tech IEAOriginal File Name Searched:
geo2010.pdfDIY PDF Search: Google It | Yahoo | Bing
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info
Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info
| CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP |