PDF Publication Title:
Text from PDF Page: 186
B-8 SL-5641 Final initial investment, constant over the evaluation period. The evaluation period covers 30 years. Investment costs in the pro forma were adjusted for construction period financing costs by assuming that spending on average will be two years before the facility’s initial commercial service. The cost of capital for this interest during construction adjustment was assumed to be 7% per year. The summary of assumptions used for cost of capital is shown in Table B-4. Table B-4 — Summary of Cost of Capital Assumptions General Length of analysis period, yr General inflation, %/yr Base year for cost escalation Financial Equity rate of return Debt rate of return Debt repayment period Percent equity in capital structure Percent debt in capital structure Entity is subject to income tax (yes/no) Cost of construction, %/yr Target DSCR Amortization period for non-depreciable investment Percentage of investment not depreciable (exclusive of IDC) Investment tax credit State income tax rate Federal income tax rate Composite income tax rate Insurance 0.50% Property taxes 0.50% Investment cost escalation rate 1.50% 30 2.5% 2002 Nominal $ 14.000% 8.50% 20 Varies Varies Yes 7.00% 1.35 20 2% 10% For non-fuel expenses When not otherwise specified in the model Constant $ 11.50% 6.00% 20 Varies Varies Yes 4.5% 1.35 Applies only to solar investment, equal to this percentage of depreciable investment Similar to 8.84% in California or 6.97% in Arizona Income tax rate (composite federal and state) Of project cost; escalated at inflation rate Of project cost; remains constant in nominal terms throughout project life 8.00% 35.00% 40.20%PDF Image | Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance Forecasts
PDF Search Title:
Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance ForecastsOriginal File Name Searched:
34440.pdfDIY PDF Search: Google It | Yahoo | Bing
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info
Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP |