PDF Publication Title:
Text from PDF Page: 120
5-20 SL-5641 Final expecting 85% to 90% learning curve based on experience. Boeing has also identified cost improvements due to improved manufacturing and quantity discount of material, which are reasonable assumptions. Material and components are about 35% of receiver costs. The cost improvements are shown below in Table 5-11: Table 5-11 — Effect of Production Volume (Percent of Total Savings) Solar Solar One Two 1988 1999 Net Plant Size – Thermal, MWt 46 42 Total, % — — Solar Solar Solar Solar Solar Tres 50 100 200 220 2004 2006 2008 2012 2018 120 380 700 1,400 1,400 7% 14% 12% 5% — The cost improvements for technology, scaling, and production volume are shown below in Table 5-12: Table 5-12 — Cost Improvements for Technology, Scaling, and Production Volume Solar Two to Solar Tres Solar Tres to Solar 50 Solar 50 to Solar 100 Solar 100 to Solar 200 Solar 200 to Solar 220 Average Cost Reduction Due to Technical (Efficiency) 32% 35% 66% 65% 31% 46% Cost Reduction Due to Scaling 5.3.3.4 Conclusion 50% 43% 25% 24% 61% 41% Cost Reduction Due to Production Volume 18% 22% 9% 11% 8% 13% Sargent & Lundy reviewed the information provided and the capital cost and cost improvements are reasonable based on the following: • The Boeing cost estimate is based on actual costs from Solar Two, with adjustments to compensate for design improvements, manufacturing improvements, construction labor rates, and escalation. • The Boeing cost estimate is based on detailed design drawings and material take-offs (bottoms- up cost estimate), which provides a high degree of accuracy.PDF Image | Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance Forecasts
PDF Search Title:
Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance ForecastsOriginal File Name Searched:
34440.pdfDIY PDF Search: Google It | Yahoo | Bing
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info
Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP |