PDF Publication Title:
Text from PDF Page: 022
ES-10 SL-5641 Final Differences and Rational for the S&L Tower Technology Projection The DOE Concentrating Solar Power Program has developed detailed baseline cost and performance data for the power tower technology. In addition, detailed technology R&D plans specify how these technologies are expected to change over time. DOE also has established assumed plant deployment forecasts over time. The S&L due-diligence-like approach used in this study reviewed the technology cost, performance, technology R&D, and deployment assumptions and identified the areas where the assumptions have not been fully demonstrated. The S&L review was based on discussions with SunLab, interaction with the CSP industry, input from other experts, and S&L in-house technical expertise. The projected levelized energy costs of electricity in 2020 estimated by S&L are 65% higher than the projections by SunLab. The main differences and rational for the S&L projections are the following: • Sargent & Lundy did not assume deployment of the advanced high temperature turbine and heliostats in 2020, whereas the SunLab assumed deployment in 2018. • Sargent & Lundy cost estimate for heliostats, which are about 45% of the total cost, are about 10% higher. The S&L estimate is based on our evaluation of cost estimates prepared by SunLab, AD Little, Advanced Thermal Systems, Solar Kinetics, and Winsmith. S&L used a contingency of 10% as compared to SunLab of 5%. S&L estimated deployment at about 25% of the SunLab estimate to take into consideration a realistic duration between the first and second deployment and between increases in plant size. S&L manufacturing costs are higher as a result of our evaluation • Sargent & Lundy estimated the costs for steam turbines and balance of plant costs using the EPRI SOAPP model, compared to S&L’s internal cost database and adjusted for labor and productivity rates in the southwestern states. The S&L estimate for steam turbines were less than SunLab. The S&L estimates for balance-of-plant costs were higher than SunLab. • The S&L receiver capital costs are based on a cost estimate provided by Boeing. Boeing was the supplier of the Solar Two receiver and is providing the receiver for Solar Tres. • Sargent & Lundy estimated that the engineering, management, and development to be 15% of the capital cost as compared to SunLab estimate of 7.8%. • SunLab included a risk pool contingency of 10% for Solar Tres, and S&L concurs with this value. In addition, S&L included a risk pool contingency of 5% for Solar 50. • S&L included a contingency of 12% for direct costs and 15% for cost reduction, in comparison to SunLab’s contingency of 7.8%PDF Image | Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance Forecasts
PDF Search Title:
Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance ForecastsOriginal File Name Searched:
34440.pdfDIY PDF Search: Google It | Yahoo | Bing
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info
Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)