logo

Radiation Machine Registration Permit Manual

PDF Publication Title:

Radiation Machine Registration Permit Manual ( radiation-machine-registration-permit-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 008

E. Annual Permit Fees Each radiation machine source permit-holder shall receive an invoice and pay an annual fee based on the fee schedule signed into law in June 2008, regardless of source status (installed, activated, or stored). See Appendix A for Fee Schedule. 1) Mailing Invoice: Radiation machine source permit-holders will be mailed an invoice for their annual fee, in the fall of each calendar year, with bill payable within 30 days of invoice date. Owner/Operators are instructed to make check payable to “Delaware Office of Radiation Control,” and mail the check AND copy of invoice to the attention of the Office of Radiation Control, to the address specified on the invoice (417 Federal Street, Dover, DE 19901). 2) Failure to Pay Fee (30 days): Radiation machine source permit-holders who do not pay their permit fee within 30 days following the invoice due date will receive a reminder letter via certified mail, with instruction to pay their fee immediately, or risk issuance of an administrative penalty in the amount of $500. 3) Failure to Pay Fee (60 days): Radiation machine source permit-holders who do not pay their permit fee within 60 days following the invoice due date will be issued an administrative penalty in the amount of $500 by the Delaware Authority on Radiation Protection, and shall be ordered to pay their fee. Radiation machine source permit-holders who do not pay their permit fee AND the administrative penalty amount within 10 days of the date on the administrative penalty letter will be forwarded to the Department of Justice for enforcement action through the Office of the Attorney General. F. Inspections 1) Routine Inspections: Periodic, routine inspections of registered machine source facilities shall be performed at frequencies established by the Authority on Radiation Protection. An inspection of a registered facility shall be performed at least every two (2) years for medical facilities utilizing angiography, radiography, fluoroscopy, computed tomography (CT), and radiation therapy modalities, and at least every four (4) years for other registered facilities, including dental, bone densitometry, podiatry, veterinary, academic and industrial. 6

PDF Image | Radiation Machine Registration Permit Manual

radiation-machine-registration-permit-manual-008

PDF Search Title:

Radiation Machine Registration Permit Manual

Original File Name Searched:

orcradmacman.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP