
PDF Publication Title:
Text from PDF Page: 147
The conceived mechanism provides a great deal of flexibility: operators are allowed to meet their obligations either by generating directly or by purchasing from others some or all the required ―green‖ energy, or simply acquiring their rights (as in the spirit of the ―Green Certificates‖). According to a Decree Law issued on January 2004, the initial quota of 2% was increased to 2.35% for the year 2005, to 2.7% for 2006 and to 3.05% for 2007 to keep up with international commitments on CO2 emission reduction. In 2007, with a subsequent law, the quota was updated to 3.80% for 2007 and a yearly increase of 0.75% per year was fixed up to 2012. The value of the Green Certificates was modified at the end of 2007, making it equal to the difference between 18 €-cent/kWh and the average market price of the electricity; a multiplying coefficient (different for each renewable energy source; it is 0.9 for geothermal) has then to be applied to this difference. Small power plants (typically below 1 MWe) are allowed a fixed price (again, differentiated by source; it is 20 €-cent /kWh for geothermal). The calculation mechanism may be updated every three years. Green Certificates are awarded to new power plants in operation after April 1999, and for a period that was initially 8 years, subsequently extended to 12 years; plants in operation after January 2008 are awarded for 15 years. As for 2010, the value of the net kWh generated from new or recent geothermal power plants awarded with Green Certificates is around 11 €-cent /kWh. This incentive makes it possible, in Italy, to proceed with the exploration, development and utilization of deep geothermal resources up to 3500-4000 m depth, which requires the drilling of very expensive wells. The electricity produced by geothermal plants with an installed capacity lower than 1 MWe is sold at a fixed price of 200 €/MWh State incentives for the direct use of heat from geothermal sources are also provided. They consist of: Incentive of 10.33 €/MWhth to the end users on a permanent basis, plus 15.49 €/ MWth to be confirmed every fiscal year Incentive to the developers for new supplies or for the increase of the existing ones, that is 20.66 €/kWt 13.4 Environmental/Acceptability Aspects The strong interaction occurring between geothermal activities and territory, taking into account that we operate in Tuscany, has placed a serious hindrance to developing new high enthalpy projects. Aiming at the retrieval of a constructive and mutually beneficial relation with the territory, Enel has set forth a number of initiatives to reduce the environmental drawbacks and increase the acceptability. New design solutions have been adopted to reduce the noise and visual impact of drilling pads, gathering systems and power plants. Moreover, an innovative plant for the abatement of mercury and hydrogen sulphide (AMIS) was designed and put into operation with very positive results, improving significantly the acceptability by local population. 13.4.1 AMIS Plant Construction The AMIS abatement plants have been designed by Enel to remove H2S and Hg from plant emissions. This technology makes it possible a substantial reduction of the environmental impact 144PDF Image | Geothermal Research and Tech IEA
PDF Search Title:
Geothermal Research and Tech IEAOriginal File Name Searched:
geo2010.pdfDIY PDF Search: Google It | Yahoo | Bing
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info
Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info
| CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP |