PDF Publication Title:
Text from PDF Page: 010
The first single-flash unit of 30MWe came online in Ahuachapán in 1975. In 1976, a second 30MWe single-flash unit was added, thereby doubling the generating capacity. In 1981 a third unit, this time double-flash, came online, bringing the total capacity to 95MWe. During the 1980s the Ahuachapán geothermal field was severely overworked. In 1981, 41% of El Salvador’s electricity demand was met by geothermal production, a peak which has never since been reached. This overuse occurred primarily because transmission lines from hydro fields in the North of El Salvador were continually damaged by guerrilla groups. This placed a prolonged, heightened demand for electricity from the geothermal field at Ahuachapán to make up for the reduced hydro output from the North. In addition, almost one third (DiPippo) of the waste liquid from the Ahuachapán plant was being discharged into the Pacific Ocean, instead of being reinjected to the reservoir source. The resulting decline in wellhead pressures and steam deliverability caused the power output to drop from 95MWe in 1985, to less than half its capacity – 45MWe – by 1994 (Huttrer). In 1996, a US $50 million project, the Ahuachapán Stabilizaion and Rehabilitation Project, funded by the InterAmerican Development Bank (IADB) was launched. The ultimate goal of the project is to ‘modernize the power plant while ensuring long-term production sustainability’ (Rodriguez and Herrera). It has four major components (Rodriguez; Rodriguez and Herrerra): a) drilling ten new production wells to the South of the production area, closer to the heat source and the recharge area; b) building a pipeline to inject brine into existing wells at Chipilapa, which is connected to the Ahuachapán reservoir. The goal is to reinject all waste brine into existing wells. c) constructing the gathering system from the new wells to the power plant and to injection wells; d) refurbishing some of the electrical and mechanical equipment in the power plant. This includes modifying turbogenerators to improve efficiency, and installing a fully computerized operating system. As Table 2 shows, the generation at Ahuachapán has been steady and growing slowly over the last five to six years, thus making the stabilizing projected a success. Spring 2004 The Geothermal Energy Industry of El Salvador 9 Janelle PrevostPDF Image | Geothermal Energy Industry of El Salvador
 
PDF Search Title:
Geothermal Energy Industry of El SalvadorOriginal File Name Searched:
Geothermal_Prevost2004.pdfDIY PDF Search: Google It | Yahoo | Bing
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info
Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info
Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info
NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info
Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info
| CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP |