logo

About ElectraTherm

PDF Publication Title:

About ElectraTherm ( about-electratherm )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 187

ENDNOTES 03 INVESTMENT FLOWS INVESTMENT FLOWS 1 China Electricity Council, provided by Shi Pengfei, China Wind Energy Association, personal communication with REN21, 12 March 2014; China Electricity Council, Planning and Statistics Department, “2013 National Electricity Industry Statistics,” 26 January 2014, http://www.cec.org.cn/guihuayutongji/tongjxinxi/ yuedushuju/2014-01-26/116224.html (using Google Translate). 2 The BNEF estimate for investment in large hydropower (>50 MW) is based on at least 20 GW of capacity commissioned during 2013 and a capital cost per MW of USD 1.75 million, bringing the total investment in large hydropower to USD 35 billion. The figure USD 1.75 billion per GW is the average value based on numbers provided by developers of large hydro projects in applications for the Clean Development Mechanism. Estimates are approximate only, due greatly to the fact that timing of the investment decision on a project may be about four years on aver¬age away from the moment of commissioning. As a result, a large share of the investment total for the projects commissioned in 2013 was actually invested in prior years; in addition, there was investment during 2013 for projects that are currently under construction and are not included in the BNEF estimates. Note that data for hydropower projects larger than 50 MW differ somewhat between this GSR and the Global Trends in Renewable Energy Investment 2014 due to different methodologies and data sources. This GSR estimates that about 40 GW of total hydropower capacity was commissioned worldwide during 2013, and a significant portion of this was projects larger than 50 MW (see Hydropower section in this report), whereas BNEF estimates that at least 24 GW of hydro capacity was commissioned in 2013, including more than 20 GW of large projects (>50 MW). Taking the BNEF estimate that 4 GW hydropower capacity <50 MW was added, that means as much as 36 GW of capacity >50 MW was added during 2013. 3 Note that these dollar amounts for capacity investment are based on BNEF estimates that some 81 GW of new capacity (not including hydropower >50 MW) was added in 2013, down from an estimated 88 GW in 2012. These numbers are not necessarily consistent with capacity data provided elsewhere in the GSR. 4 For more information, see “Green Bond Principles 2014: Voluntary Process Guidelines for Issuing Green Bonds,” http://www.ceres.org/resources/reports/green-bond-principles- 2014-voluntary-process-guidelines-for-issuing-green-bonds/ view. RENEWABLES 2014 GLOBAL STATUS REPORT 187 03

PDF Image | About ElectraTherm

about-electratherm-187

PDF Search Title:

About ElectraTherm

Original File Name Searched:

gsr2014_full_report_low_res.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP