POLICY GUIDE FOR SOUTHERN WINDSOR COUNTY

PDF Publication Title:

POLICY GUIDE FOR SOUTHERN WINDSOR COUNTY ( policy-guide-for-southern-windsor-county )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 023

ADDENDUM Plan Conformance. New commercial, utility-scale generation facilities and proposed system upgrades, should be identified in or be consistent with the Vermont Comprehensive Energy Plan, the Vermont Long-Range Transmission Plan and the utility's Integrated Resource Plan (IRP). A new facility should be considered only after potential alternatives, including increased energy efficiency, distributed energy systems, and existing facility upgrades are evaluated and found to be insufficient to meet system reliability needs or projected demand. Benefits. A demonstrated public need that outweighs adverse impacts to local residents and resources must be documented for municipal support of new, large-scale utility projects located within or which may otherwise affect the Town of _____. Facility development must benefit town residents, businesses, and property owners in direct relation and proportion to the impacts of the proposed development. Impacts. New generation, transmission, and distribution facilities must be evaluated for consistency with community and regional development objectives, and to avoid undue adverse impacts to public health, safety and welfare, and significant cultural, natural and scenic resources identified by the community. Decommissioning. All facility certificates or permits should specify conditions for system abandonment and decommissioning, including required sureties for facility removal and site restoration to a safe, useful, and environmentally stable condition. All hazardous materials and structures, including foundations, pads and accessory structures, must be removed from the site. Facility Siting Preferred Areas: New generation and transmission facilities shall be sited in locations that reinforce the community's traditional and planned patterns of growth, of compact [downtown, village] centers surrounded by a rural countryside, including working farm and forest land. The following areas have been identified by the town as suitable for the development of larger, utility-scale renewable energy and transmission facilities, consistent with this pattern of development, based on the municipal review of state energy plans, municipal participation in state energy plan development, an analysis of available renewable energy resources, technical facility requirements, and municipal resource conservation and development goals and objectives: Prohibited (Exclusion) Areas. Because of their distinctive natural, historic or scenic value, and their special significance to the community, energy facility development shall be excluded from [prohibited within], and shall not be supported by the town in the following locations, as mapped by the municipality: [List – which may include some of the areas or resources noted below or, as noted above, could also reference certain zoning districts.] Note: The municipality should identify and map those areas suitable for large-scale energy development, as identified from the review of planned facility upgrades, to be referenced in the municipal plan, and/ or from a community-wide inventory and mapping project. This could also include specifying suitable zoning districts, as appropriate. 21

PDF Image | POLICY GUIDE FOR SOUTHERN WINDSOR COUNTY

PDF Search Title:

POLICY GUIDE FOR SOUTHERN WINDSOR COUNTY

Original File Name Searched:

Appendix_7_Energy_Policies_Standards_A_Guide....pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)