DOE Solar Energy Technologies Program

PDF Publication Title:

DOE Solar Energy Technologies Program ( doe-solar-energy-technologies-program )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 201

2.1 Phase I: Project Site Development Work 2.2. Phase II: Project Construction Project Coordination and Oversight: • Prepare project proposal with budget and • schedule and coordinate with funding entity. • Coordinate with Boulder City to maintain the • lease performance requirements. • Coordinate with concerned Nevada entities to • affirm project features and approach. • • Coordinate with other entities in the Energy Zone. • • Conduct competitive architect and engineering subcontract process. • • Oversee selected architect and engineering performance. • Track project schedule and budget and report to funding entity as necessary. Project Development Work: • Conduct survey and staking of 40-acre site. • Perform all necessary land access activities. • Conduct NEPA process. • Design features of project necessary for initial operation. • Identify and prepare applications for all needed permits. • Determine availability and cost of utility services (electric power, water, natural gas, telephone, and broadband communications). • Support foundation efforts to identify partnership opportunities with cost-share potential. • Assemble complete project site design specifications and drawing package. • Identify potential Engineer, Procure, Construct (EPC) contractors for site preparation and construction of all project site features. • Prepare Phase I report identifying estimated project construction cost and schedule, proposed operating plan, and assessment of merits of proceeding with Phase II. Estimated Outcome of Phase I: The report provided on completion of Phase I efforts will identify all issues pertinent to proceeding with construction of the project. Utility infrastructure, site physical issues, and site security considerations will be addressed. All permitting and federal, state, and local environmental requirements will be addressed. A detailed budget and schedule will be provided to support the necessary additional project funding. Project Coordination and Oversight: Maintain budget and schedule coordination with funding entity. Coordinate with Boulder City to maintain the lease performance requirements. Coordinate with concerned Nevada entities. Coordinate with other entities in the Energy Zone. Conduct competitive Engineer, Procure, Construct (EPC) subcontract process. Oversight of selected EPC contractor performance during site preparation and construction of all necessary project features including building, pavement, parking areas, walk trails and test pads and fencing. • Track project schedule and budget and report to funding entity as necessary. Project Development Work: • Submit all needed permits with fees. • Apply for Desert Tortoise remediation permit with fee. • Apply for all necessary utility services (electric power, telephone, water, and natural gas). • Arrange construction of all features of the project. • Arrange for delivery and set up of solar and other apparatus on test pads. • Arrange electrical and mechanical integration of all systems necessary for initial operations. Expected Outcome of Phase II: An EPC subcontractor will be selected to secure permits and construct the project. The project will be constructed according to the design and specifications determined in Phase I. The completed Solar Technology Center will provide schools and the interested public a practical means of observing solar and other renewable energy apparatus in the natural environment contiguous to large solar and other power-production facilities. Opportunities to demonstrate renewable energy technologies will be provided to private entities, Nevada energy utilities, elements of the University of Nevada system, and federal laboratories. 195 EERE Crosscutting Activities

PDF Image | DOE Solar Energy Technologies Program

PDF Search Title:

DOE Solar Energy Technologies Program

Original File Name Searched:

38743.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)